The violations identified indicate a broad spectrum of problems exist in FPC's Engineering program at Crystal River Unit 3. The action includes: (1) a Severity Level II problem for failure to meet the requirements of 10 CFR 50.59 in six cases; (2) a Severity Level III violation for failure to ensure that regulatory and plant design basis requirements are met; and, (3) a Severity Level III violation for untimely and inadequate corrective actions resulting in the failure to identify significant unreviewed safety questions and containment integrity issues.